When inspecting tunnels,
This had been a major burden, butScanat under the initiative that introduced [...],
This significantly reduces measurement work andimproves accuracy and reproducibility.
→ [Video 11:55–]
In conventional national highway maintenance and repair projects, the back-and-forth process of on-site inspection → reporting to the government office → another on-site inspection resulted in significant time loss, which was a major challenge.
However,Scanat After implementation,
This shift in workflow has reduced the need for on-site trips and improved decision-making speed.
→ [Video 16:04–]
A key feature of this pilot project was the ability to share field data in real time.
By allowing users to upload 3D models directly from the field and share them via a link,
This made it possible to achieve a 58% reduction in on-site surveys and a 33% reduction in personnel.
→ [Video 18:51–]
For pavement repairs (patching),
Traditionally, this required multiple people to take measurements using tape and create drawings by hand, but
This change has led to a significant reduction in man-hours and a simplification of reporting procedures.
→ [Video 22:50–]
Conducting on-site surveys “all by yourself with just a smartphone”Scanat